Prepare to Alter Course
Derecktor Ft. Pierce
A “Full Service” Maintenance, Repair, Refit and New Construction Facility
Introducing Derecktor Ft. Pierce. America’s first shipyard designed and built specifically for megayachts.
It’s a new world for megayachts. Derecktor Ft. Pierce is here, and the global fleet has a brand new destination. America’s first repair and refit yard designed and built with the 200 ft., 900 ton and up fleet in mind, Derecktor Ft. Pierce (DFP) will match the world’s great refit yards in both facility and ability.
Situated directly inside Fort Pierce Inlet 3nm from the Atlantic Ocean, DFP offers deepwater (26 ft. project depth) access with no overhead obstructions. Eight acres of level concrete apron give ample storage and repair space, with a newly refitted building housing machine, wood, electrical and pipe shops along with offices and other support services. The largest mobile hoist - 1,500 tons - in the U.S., along with a planned 5,000 ton drydock will provide unmatched flexibility and hauling capacity. Pair all this with the legendary tradition and renowned expertise of Derecktor, and you’ll find a unique combination of facility and ability.
It’s why we can say - Derecktor Ft. Pierce. No Job Too Big.
Ft. Pierce Capacities
-
Facility
90 nautical miles north of Fort Lauderdale
-
Out of Water Shed Storage
40,000 sq. ft.
covered service building -
Wet Slips/Dockage
2 bulkhead docks – 330’ and 450’
-
Storage
containers available
-
Power
480-volt 3 phase
208-volt 3 phase
220/110-volt single phase -
Lift
1,500 ton Cimolai® mobile boat hoist
-
Maximum Vessel Length
500 ft (152m)
-
Maximum Vessel Beam
unlimited
-
Maximum Draft
28 ft (8.5m)
-
Maximum Height
unlimited